24-Bit, 96KSPS ADC for AV Receiver
Referenzdesign unter Verwendung des Teils PCM1803 von Texas Instruments
Für Endprodukte
- AV Receiver
- MP3 Player/Recorder
Beschreibung
- DEM-DAI1803 is an evaluation board for PCM1803, a 96-kHz, 24-bit PCM audio A/D converter, with digital audio transmitter, mode-control switches and jumpers, on-board oscillator, 6-dB amplifier, and low-pass filter (LPF)
Haupteigenschaften
-
ADC Resolution24 Bit
-
ADC Sampling Rate96K SPS
Empfohlene Bauteile (34)
| Teilenummer | Hersteller | Typ | Beschreibung | |||
|---|---|---|---|---|---|---|
|
|
REG1117-3.3/2K5 | Texas Instruments | Linear Regulators | LDO Regulator Pos 3.3V 0.8A 4-Pin(3+Tab) SOT-223 T/R | In den Warenkorb | |
|
|
74HCU04D-Q100J | Nexperia | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin SO T/R Automotive AEC-Q100 | In den Warenkorb | |
|
|
74HCU04PW-Q100J | Nexperia | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin TSSOP T/R Automotive AEC-Q100 | In den Warenkorb | |
|
|
74HC245PW,118 | Nexperia | Bus Transceivers | Bus XCVR Single 8-CH 3-ST 20-Pin TSSOP T/R | In den Warenkorb | |
|
|
REG1117-3.3/2K5G4 | Texas Instruments | Linear Regulators | LDO Regulator Pos 3.3V 0.8A 4-Pin(3+Tab) SOT-223 T/R | In den Warenkorb | |
|
|
74HCU04D-Q100J | Nexperia | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin SO T/R Automotive AEC-Q100 | In den Warenkorb | |
|
|
74HCU04D,653 | Nexperia | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin SO | In den Warenkorb | |
|
|
74VHC14MTCX | onsemi | Inverters and Schmitt Triggers | Inverter Schmitt Trigger 6-Element CMOS 14-Pin TSSOP W T/R | In den Warenkorb | |
|
|
74HC245D | Toshiba | Bus Transceivers | Bus XCVR Single 8-CH 3-ST 20-Pin SOIC T/R | In den Warenkorb | |
|
|
74HC245PW-Q100J | Nexperia | Bus Transceivers | Bus XCVR Single 8-CH 3-ST Automotive 20-Pin TSSOP T/R | In den Warenkorb | |
|
|
74HCU04PW-Q100 | Nexperia | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin TSSOP T/R Automotive AEC-Q100 | In den Warenkorb | |
|
|
74HC245D(BJ) | Toshiba | Bus Transceivers | Bus XCVR Single 8-CH 3-ST 20-Pin SOIC T/R | In den Warenkorb | |