ADS5474ADX-EVM, Evaluation Module for ADS5474, 1-CH, 14-bit, 800 MSPS Analog to Digital Converter
Referenzdesign unter Verwendung des Teils ADS5474IPFP von Texas Instruments
Für Endprodukte
- Communications and Telecom
- Data Acquisition System
- Measurement Instruments
- Radar System
- Software Defined Radio
- Test Equipment
Beschreibung
- ADS5474ADX-EVM, is a 14-bit, 800 MSPS digitizer solution evaluation module. The EVM incorporates two 14-bit, 400 MSPS ADS5474 ADCs operating in an interleaved mode to create an 800 MSPS digitizer. The outputs of the two ADCs feed a Xilinx Virtex 5 FPGA which is pre-configured with proprietary interleaving technology from SP Devices. The SP Devices' interleaving technology continuously analyzes the ADCs' outputs to automatically remove the interleaving spurs arising from gain an mismatch errors, removing the need for costly monitoring components and an off-line recalibration routine
Haupteigenschaften
-
ADC Resolution14 Bit
-
ADC Sampling Rate800M SPS
-
Number of Channels1CH
Empfohlene Bauteile (28)
| Teilenummer | Hersteller | Typ | Beschreibung | |||
|---|---|---|---|---|---|---|
|
|
DS2432P-100-011+ | Analog Devices | EEPROM | EEPROM Serial-1Wire 1K-bit 4Pages x 256 3.3V/5V 6-Pin TSOC | In den Warenkorb | |
|
|
DS2432PLF | Analog Devices | EEPROM | EEPROM Serial-1Wire 1K-bit 4Pages x 256 3.3V/5V 6-Pin TSOC Tube | In den Warenkorb | |
|
|
DS2432PLF | Analog Devices | EEPROM | EEPROM Serial-1Wire 1K-bit 4Pages x 256 3.3V/5V 6-Pin TSOC Tube | In den Warenkorb | |
|
|
DS2432P+ | Analog Devices | EEPROM | EEPROM Serial-1Wire 1K-bit 4Pages x 256 3.3V/5V 6-Pin TSOC Tube | In den Warenkorb | |
|
|
REG104FA-5/500G3 | Texas Instruments | Linear Regulators | LDO Regulator Pos 5V 1A 6-Pin(5+Tab) DDPAK T/R | In den Warenkorb | |
|
|
REG104GA-3.3G4 | Texas Instruments | Linear Regulators | LDO Regulator Pos 3.3V 1A 6-Pin(5+Tab) SOT-223 Tube | In den Warenkorb | |
|
|
REG104GA-3.3/2K5G4 | Texas Instruments | Linear Regulators | LDO Regulator Pos 3.3V 1A 6-Pin(5+Tab) SOT-223 T/R | In den Warenkorb | |
|
|
DS2432P+ T&R | Analog Devices | EEPROM | EEPROM Serial-1Wire 1K-bit 4Pages x 256 3.3V/5V 6-Pin TSOC T/R | In den Warenkorb | |
|
|
REG104GA-3.3 | Texas Instruments | Linear Regulators | LDO Regulator Pos 3.3V 1A 6-Pin(5+Tab) SOT-223 Tube | In den Warenkorb | |
|
|
DS2432P+ | Analog Devices | EEPROM | EEPROM Serial-1Wire 1K-bit 4Pages x 256 3.3V/5V 6-Pin TSOC Tube | In den Warenkorb | |
|
|
REG104GA-3.3/2K5 | Texas Instruments | Linear Regulators | LDO Regulator Pos 3.3V 1A 6-Pin(5+Tab) SOT-223 T/R | In den Warenkorb | |
|
|
REG104GA-3.3/2K5G4 | Texas Instruments | Linear Regulators | LDO Regulator Pos 3.3V 1A 6-Pin(5+Tab) SOT-223 T/R | In den Warenkorb | |