bq76PL455EVM, Evaluation Module for bq76PL455A-Q1 16-Cell Battery Monitor with Passive Cell Balancing
Referenzdesign unter Verwendung des Teils BQ76PL455ATPFCRQ1 von Texas Instruments
Für Endprodukte
- Embedded System
- PC Peripherals
- Power Supplies
- Temperature Monitoring
Beschreibung
- bq76PL455EVM, Evaluation Module for bq76PL455A-Q1 is a highly integrated automotive Li-ion battery management solution that measures the voltages of up to 16 cells connected in series as part of a larger battery stack and reports them via a high speed differential communications link. It provides passive cell balancing outputs with timer. Secondary protection of cells for over or under-voltage conditions is provided by 32 comparators
Haupteigenschaften
-
Battery TypeLithium-Ion
-
Input Voltage16 to 79.2 V
-
Output Voltage5 V
-
Number of Battery Cells16
Empfohlene Bauteile (4)
| Teilenummer | Hersteller | Typ | Beschreibung | |||
|---|---|---|---|---|---|---|
|
|
CHS-04TA | NIDEC COMPONENTS CORPORATION | Switch Slide | Switch Slide OFF ON 4PST Recessed Slide 0.1A 24VDC J-Lead SMD T/R | In den Warenkorb | |
|
|
BQ76PL455ATPFCTQ1 | Texas Instruments | Battery Management ICs | Battery Balancer/Battery Monitoring 5mA 80-Pin TQFP T/R Automotive AEC-Q100 | In den Warenkorb | |
|
|
NC7SZ04M5X | onsemi | Inverters and Schmitt Triggers | Inverter 1-Element CMOS 5-Pin SC-74A T/R | In den Warenkorb | |
|
|
BQ76PL455ATPFCRQ1 | Texas Instruments | Battery Management ICs | Battery Balancer/Battery Monitoring 5mA 80-Pin TQFP T/R Automotive AEC-Q100 | In den Warenkorb | |