DAC3482 EVM, Evaluation Module for DAC3482, 2-Channel, 16-bit, 1.25 GSPS Ultra-Low power Digital-To-Analog Converter
Referenzdesign unter Verwendung des Teils DAC3482IRKDT von Texas Instruments
Zugehörige Dokumente
Für Endprodukte
- Cell Basestation
- Communications and Telecom
Beschreibung
- DAC3482 EVM, Evaluation Module for DAC3482, 2-Channel, 16-bit, 1.25 GSPS Ultra-Low power Digital-To-Analog Converter (DAC) with 16-bit or 8-bit wide DDR LVDS data input, integrated 2x/4x/8x/16x interpolation filters, 32-bit NCO and PLL, and exceptional linearity at high IFs. The EVM provides a flexible environment to test the DAC3482 under a variety of clock and data input, and IF output conditions
Haupteigenschaften
-
DAC Resolution16 Bit
-
DAC Sampling Rate1.25G SPS
-
Number of Channels2CH
Empfohlene Bauteile (26)
| Teilenummer | Hersteller | Typ | Beschreibung | |||
|---|---|---|---|---|---|---|
|
|
SN74HC241PWRE4 | Texas Instruments | Buffers and Line Drivers | Buffer/Line Driver 8-CH Non-Inverting 3-ST CMOS 20-Pin TSSOP T/R | In den Warenkorb | |
|
|
CDCM1802RGTR | Texas Instruments | Clock Buffers and Drivers | Clock Divider/Fanout Buffer 2-OUT 1-IN 1:2 16-Pin VQFN EP T/R | In den Warenkorb | |
|
|
TPS62420DRCR | Texas Instruments | DC to DC Converter and Switching Regulator Chip | Conv DC-DC 2.5V to 6V Synchronous Step Down Dual-Out 0.6V to 6V 0.6A/1A 10-Pin VSON EP T/R | In den Warenkorb | |
|
|
NFM31PC276B0J3B | Murata Manufacturing | Capacitor Feed Through | Cap Feed Through 27uF 6.3VDC 20% Pad Flat 1206 85°C | In den Warenkorb | |
|
|
CDCM1802RGTRG4 | Texas Instruments | Clock Buffers and Drivers | Clock Divider/Fanout Buffer 2-OUT 1-IN 1:2 16-Pin VQFN EP T/R | In den Warenkorb | |
|
|
SN74AHC541PWR | Texas Instruments | Buffers and Line Drivers | Buffer/Line Driver 8-CH Non-Inverting 3-ST CMOS 20-Pin TSSOP T/R | In den Warenkorb | |
|
|
SN74AHC541PWR-P | Texas Instruments | Buffers and Line Drivers | Buffer/Line Driver 8-CH Non-Inverting 3-ST CMOS 20-Pin TSSOP T/R | In den Warenkorb | |
|
|
CDCM1802RGTT | Texas Instruments | Clock Buffers and Drivers | Clock Divider/Fanout Buffer 2-OUT 1-IN 1:2 16-Pin VQFN EP T/R | In den Warenkorb | |
|
|
NFM31PC276B0J3L | Murata Manufacturing | Capacitor Feed Through | Cap Feed Through 27uF 6.3VDC 20% Pad Flat 1206 85°C | In den Warenkorb | |
|
|
SN74AHC541PWRG4 | Texas Instruments | Buffers and Line Drivers | Buffer/Line Driver 8-CH Non-Inverting 3-ST CMOS 20-Pin TSSOP T/R | In den Warenkorb | |
|
|
CDCM1802RGTTG4 | Texas Instruments | Clock Buffers and Drivers | Clock Divider/Fanout Buffer 2-OUT 1-IN 1:2 16-Pin VQFN EP T/R | In den Warenkorb | |
|
|
TPS74201RGWR | Texas Instruments | Linear Regulators | LDO Regulator Pos 0.8V to 3.6V 1.5A 20-Pin VQFN EP T/R | In den Warenkorb | |