DAC5674 EVM, Evaluation Module using DAC5674, 14-Bit, 400 MSPS, 2x/4x Interpolating Digital-To-Analog Converter
Referenzdesign unter Verwendung des Teils DAC5674IPHP von Texas Instruments
Für Endprodukte
- Arbitrary Waveform Generator
- Cable Modem
- Cell Basestation
- Direct Digital Synthesis
- Measurement Instruments
- Test Equipment
Beschreibung
- DAC5674 EVM, Evaluation Module using DAC5674, 14-Bit, 400 MSPS, 2x/4x Interpolating CommsDAC Digital to Analog Converter. This evaluation module is designed to enable you to evaluate the device under various modes of operation
Haupteigenschaften
-
DAC Resolution14 Bit
-
DAC Sampling Rate400M SPS
-
Number of Channels1CH
Empfohlene Bauteile (11)
| Teilenummer | Hersteller | Typ | Beschreibung | |||
|---|---|---|---|---|---|---|
|
|
SN74LVC04APWG4 | Texas Instruments | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin TSSOP Tube | In den Warenkorb | |
|
|
SN74LVC04APWRE4 | Texas Instruments | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin TSSOP T/R | In den Warenkorb | |
|
|
SN74LVC04APWRG3 | Texas Instruments | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin TSSOP T/R | In den Warenkorb | |
|
|
SN74LVC04APWRG4 | Texas Instruments | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin TSSOP T/R | In den Warenkorb | |
|
|
SN74LVC04APW | Texas Instruments | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin TSSOP Tube | In den Warenkorb | |
|
|
SN74LVC04APWTG4 | Texas Instruments | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin TSSOP T/R | In den Warenkorb | |
|
|
SN74LVC04APWR | Texas Instruments | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin TSSOP T/R | In den Warenkorb | |
|
|
SN74LVC04APWT | Texas Instruments | Inverters and Schmitt Triggers | Inverter 6-Element CMOS 14-Pin TSSOP T/R | In den Warenkorb | |
|
|
DAC5674IPHPR | Texas Instruments | Digital to Analog Converters - DACs | DAC 1-CH Segment 14-bit 48-Pin HTQFP EP T/R | In den Warenkorb | |
|
|
DAC5674IPHP | Texas Instruments | Digital to Analog Converters - DACs | DAC 1-CH Segment 14-bit 48-Pin HTQFP EP Tray | In den Warenkorb | |
|
|
DAC5674IPHPG4 | Texas Instruments | Digital to Analog Converters - DACs | DAC 1-CH Segment 14-bit 48-Pin HTQFP EP Tray | In den Warenkorb | |