INA3221EVM, Evaluation Board and Software Tutorial using INA3221 three-channel and high-side current sensor
Referenzdesign unter Verwendung des Teils INA3221 von Texas Instruments
Für Endprodukte
- Automotive and Transportation
- Communications and Telecom
- Computers and Peripherals
- Consumer Electronics
- Energy
- Industrial
- Lighting
- Medical and Healthcare
- Security
- Video and Imaging
Beschreibung
- INA3221EVM, Evaluation Board and Software Tutorial using INA3221 is a three-channel, high-side current sensor and bus voltage monitor with an I2C interface. The INA3221 monitors both shunt drops and bus supply voltages with programmable conversion times and averaging modes. The INA3221 offers both critical and warning alerts to detect multiple programmable out-of-range conditions for each channel. It discusses how to set up and configure the software and hardware, and reviews various aspects of the program operation
Haupteigenschaften
-
Number of SuppliesTriple
Empfohlene Bauteile (3)
| Teilenummer | Hersteller | Typ | Beschreibung | |||
|---|---|---|---|---|---|---|
|
|
INA3221AIRGVT | Texas Instruments | Power Supply Controllers and Monitors | Monitor 2.7V to 5.5V 16-Pin VQFN EP T/R | In den Warenkorb | |
|
|
INA3221AQRGVRQ1 | Texas Instruments | Power Supply Controllers and Monitors | Monitor 2.7V to 5.5V Automotive AEC-Q100 16-Pin VQFN EP T/R | In den Warenkorb | |
|
|
INA3221AIRGVR | Texas Instruments | Power Supply Controllers and Monitors | Monitor 2.7V to 5.5V 16-Pin VQFN EP T/R | In den Warenkorb | |