SN65HVD01-EVM, Evaluation Module for a 3.3V RS-485 with Flexible I/O Supply and Selectable Speed
Referenzdesign unter Verwendung des Teils SN65HVD01DRC von Texas Instruments
Für Endprodukte
- Communications and Telecom
- Industrial
- Telecom Infrastructure
Beschreibung
- SN65HVD01-EVM, Evaluation Module for a 3.3V RS-485 with Flexible I/O Supply and Selectable Speed. The SN65HVD01-EVM helps designers evaluate device performance, supporting fast development and analysis of data transmission systems using the SN65HVD01DRC low-power transceiver at 250kbps or 20Mbps. Data, enable and bus signals can be powered from a 1.8V to 3.3V supply. The bus signals require a 3.3V supply
Haupteigenschaften
-
Interface StandardsRS-485
-
Supply VoltageSingle(5) V
-
Input Voltage1.8 to 3.3 V
-
FunctionsLine Transmitter/Receiver
Empfohlene Bauteile (5)
| Teilenummer | Hersteller | Typ | Beschreibung | |||
|---|---|---|---|---|---|---|
|
|
TLV7103318DSET | Texas Instruments | Linear Regulators | LDO Regulator Pos 1.8V3.3V 0.2A/0.2A 6-Pin WSON T/R | In den Warenkorb | |
|
|
TLV7103318DSER | Texas Instruments | Linear Regulators | LDO Regulator Pos 1.8V3.3V 0.2A/0.2A 6-Pin WSON T/R | In den Warenkorb | |
|
|
TLV7103318QDSERQ1 | Texas Instruments | Linear Regulators | LDO Regulator Pos 1.8V3.3V 0.2A Automotive AEC-Q100 6-Pin WSON T/R | In den Warenkorb | |
|
|
SN65HVD01DRCR | Texas Instruments | Bus Line Transceivers | Single Transmitter/Receiver RS-422/RS-485 10-Pin VSON EP T/R | In den Warenkorb | |
|
|
SN65HVD01DRCT | Texas Instruments | Bus Line Transceivers | Single Transmitter/Receiver RS-485 10-Pin VSON EP T/R | In den Warenkorb | |