TPS70351EVM-165, Evaluation Board for TPS70351 Low-Dropout, Dual-Output Linear Regulator
Referenzdesign unter Verwendung des Teils TPS70351PWP von Texas Instruments
Für Endprodukte
- FPGA Solutions
- Processor Power Management
Beschreibung
- TPS70351EVM-165, Evaluation Board using TPS70351 Low-Dropout, Dual-Output Linear Regulator. LDOs provide ideal power supplies for rapidly transitioning DSP loads. The TPS70351 is designed to provide a complete power management solution for DSP, processor power, ASIC, FPGA and digital applications where dual output voltage regulators are required
Haupteigenschaften
-
Conversion TypeDC to DC
-
Input Voltage2.7 to 6 V
-
Output Voltage1.8|3.3 V
-
Output Current1@3.3V|2@1.8V A
-
TopologyLDO
Empfohlene Bauteile (7)
| Teilenummer | Hersteller | Typ | Beschreibung | |||
|---|---|---|---|---|---|---|
|
|
TLC555CDR | Texas Instruments | Timers | Standard Timer Single 0°C 70°C 8-Pin SOIC T/R | In den Warenkorb | |
|
|
TPS2812DR | Texas Instruments | Gate and Power Drivers | Driver 2A 2-OUT High Speed Non-Inv 8-Pin SOIC T/R | In den Warenkorb | |
|
|
TPS2812D | Texas Instruments | Gate and Power Drivers | Driver 2A 2-OUT High Speed Non-Inv 8-Pin SOIC Tube | In den Warenkorb | |
|
|
TPS2812DRG4 | Texas Instruments | Gate and Power Drivers | Driver 2A 2-OUT High Speed Non-Inv 8-Pin SOIC T/R | In den Warenkorb | |
|
|
TPS70351PWPR | Texas Instruments | Linear Regulators | LDO Regulator Pos 1.8V3.3V 1A/2A 24-Pin HTSSOP EP T/R | In den Warenkorb | |
|
|
TPS70351PWP | Texas Instruments | Linear Regulators | LDO Regulator Pos 1.8V3.3V 1A/2A 24-Pin HTSSOP EP Tube | In den Warenkorb | |
|
|
TPS70351PWPG4 | Texas Instruments | Linear Regulators | LDO Regulator Pos 1.8V3.3V 1A/2A 24-Pin HTSSOP EP Tube | In den Warenkorb | |