ADS1245EVM, Evaluation Board using ADS1245, 24-bit, 15 SPS delta-sigma Analog to Digital Converter
Referenzdesign unter Verwendung des Teils ADS1245IDGS von Texas Instruments
Für Endprodukte
- Handheld POS Scanner
- Industrial Process Measurement and Control
- Portable Medical Instrumentation
- Weigh Scale/Bridge Sensor
Beschreibung
- ADS1245EVM, Evaluation Board using ADS1245, 24-bit, 15 SPS delta-sigma Analog to Digital Converter. Designed for prototyping and evaluation, they include a reference circuit and an oscillator circuit with two selectable frequencies
Haupteigenschaften
-
ADC Resolution24 Bit
-
ADC Sampling Rate15 SPS
-
Number of Channels1CH
Empfohlene Bauteile (9)
| Teilenummer | Hersteller | Typ | Beschreibung | |||
|---|---|---|---|---|---|---|
|
|
SN74LVC1G80DBVR | Texas Instruments | Flip Flops | Flip Flop D-Type Pos-Edge Push-Pull 1-Element 5-Pin SOT-23 T/R | In den Warenkorb | |
|
|
SN74LVC1G80DBVRG4 | Texas Instruments | Flip Flops | Flip Flop D-Type Pos-Edge Push-Pull 1-Element 5-Pin SOT-23 T/R | In den Warenkorb | |
|
|
REF1004I-2.5 | Texas Instruments | Voltage References | V-Ref Precision 2.5V 20mA 8-Pin SOIC Tube | In den Warenkorb | |
|
|
REF1004I-2.5/2K5 | Texas Instruments | Voltage References | V-Ref Precision 2.5V 20mA 8-Pin SOIC T/R | In den Warenkorb | |
|
|
24LC256-I/SN | Microchip Technology | EEPROM | EEPROM Serial-I2C 256K-bit 32K x 8 3.3V/5V 8-Pin SOIC N Tube | In den Warenkorb | |
|
|
SN74LVC1G80DBVRE4 | Texas Instruments | Flip Flops | Flip Flop D-Type Pos-Edge Push-Pull 1-Element 5-Pin SOT-23 T/R | In den Warenkorb | |
|
|
24LC256-I/SNG | Microchip Technology | EEPROM | EEPROM Serial-I2C 256K-bit 32K x 8 3.3V/5V 8-Pin SOIC N Tube | In den Warenkorb | |
|
|
REF1004I-2.5/2K5 | Texas Instruments | Voltage References | V-Ref Precision 2.5V 20mA 8-Pin SOIC T/R | In den Warenkorb | |
|
|
ADS1245IDGST | Texas Instruments | Analog to Digital Converters - ADCs | 1-Channel Single ADC Delta-Sigma 15sps 24-bit Serial 10-Pin VSSOP T/R | In den Warenkorb | |