DAC8871EVM, Evaluation Board using DAC8871, 16-Bit Single Channel, Serial Interface, High Voltage Bipolar Output DAC
Referenzdesign unter Verwendung des Teils DAC8871 von Texas Instruments
Für Endprodukte
- Automatic Test Equipment
- Data Acquisition System
- Industrial Process Measurement and Control
- Optical Networking
- Portable
Beschreibung
- DAC8871EVM, Evaluation Board using DAC8871, 16-Bit Single Channel, Serial Interface, High Voltage Bipolar Output DAC converter operating from a dual 18 V power supply. This converter provides excellent linearity (1 LSB INL), low glitch, low noise fast settling over its specified temperature range of -40C to +105C. A precision voltage reference is provided on the EVM to allow uni-polar operation at +10 Volts
Haupteigenschaften
-
DAC Resolution16 Bit
-
Number of Channels1CH
Empfohlene Bauteile (16)
| Teilenummer | Hersteller | Typ | Beschreibung | |||
|---|---|---|---|---|---|---|
|
|
REF102CU | Texas Instruments | Voltage References | V-Ref Precision 10V 10mA 8-Pin SOIC Tube | In den Warenkorb | |
|
|
INA105KU/2K5 | Texas Instruments | Special Purpose Amplifiers | SP Amp DIFF AMP Single ±18V 8-Pin SOIC T/R | In den Warenkorb | |
|
|
OPA4227UA/2K5 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Quad Precision Amplifier ±18V/36V 14-Pin SOIC T/R | In den Warenkorb | |
|
|
OPA4227UA/2K5 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Quad Precision Amplifier ±18V/36V 14-Pin SOIC T/R | In den Warenkorb | |
|
|
REF102CU/2K5 | Texas Instruments | Voltage References | V-Ref Precision 10V 10mA 8-Pin SOIC T/R | In den Warenkorb | |
|
|
OPA4227UA/2K5G4 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Quad Precision Amplifier ±18V 14-Pin SOIC T/R | In den Warenkorb | |
|
|
OPA4227UA/2K5G4 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Quad Precision Amplifier ±18V 14-Pin SOIC T/R | In den Warenkorb | |
|
|
REF102CU/2K5 | Texas Instruments | Voltage References | V-Ref Precision 10V 10mA 8-Pin SOIC T/R | In den Warenkorb | |
|
|
OPA4227UA | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Quad Precision Amplifier ±18V/36V 14-Pin SOIC Tube | In den Warenkorb | |
|
|
INA105KU/2K5 | Texas Instruments | Special Purpose Amplifiers | SP Amp DIFF AMP Single ±18V 8-Pin SOIC T/R | In den Warenkorb | |
|
|
DAC8871SPW | Texas Instruments | Digital to Analog Converters - DACs | DAC 1-CH R-2R 16-bit 16-Pin TSSOP Tube | In den Warenkorb | |
|
|
DAC8871SBPW | Texas Instruments | Digital to Analog Converters - DACs | DAC 1-CH R-2R 16-bit 16-Pin TSSOP Tube | In den Warenkorb | |